2003 |
 |
Phelps Dodge
General maintenance to enameling oven. |
|
|
|
2004 |
 |
GEIMM
Installation of crane and steel cutter machine |
|
|
 |
Phelps Dodge
Relocation of ovens and machinery for magnet wire process |
|
|
|
2005 |
 |
Black & Decker
Paint ovens installation and equipment relocation. |
|
|
 |
Tempel
Slitter equipment leveling and installation. |
|
|
 |
Arnecom
Relocation of process equipment for cable production. |
|
|
 |
Piasa
Stainless steel process tanks adjustment and installation.
|
|
|
 |
GEIMM
Cut building expansion. |
|
|
 |
Kwikset
Equipment installation |
|
|
|
2006 |
 |
Comex
Gypsum board plant mechanical installation. |
|
|
 |
Piasa
Steam generation system installation. |
 |
Alcoa
Dura Bright treatment tanks system installation |
 |
GETTC
Equipment relocations. |
|
|
 |
Magnekon
Enameling cable oven installation. |
|
|
 |
GEIMM
CASA project process equipment relocation from Cd. Juarez, Chihuahua, to García, N.L. |
|
|
|
2007 |
 |
Magnekon
Enameling cable oven installation. |
|
|
 |
Flinn & Dreffein
Oven installation at Tempel de Mexico plant. |
|
|
 |
Man
USG Gypsum board plant mechanical and electrical installation |
 |
Prosel
Cooling tower and docks installation |
 |
Honeywell
Electric backup system installation. |
 |
Honeywell
Reconfiguration of equipment layout at Low Bay area. |
 |
USG
Mill maintenance and installation. |
 |
Lamosa
Services pipes supply and installation. |
 |
Docsa
Power and light systems supply and installation. |
 |
GETTC
Equipment relocation at plant. |
 |
Jones Lang Lasalle
General maintenance services for buildings. |
|
|
|
2008 |
 |
Honeywell
300PSI Compressor and Header installation |
|
Palm Technologies
Electrical and control installation for platinum chrome line. |
 |
Weiser Lock
Installation for 2000Amp electric feed for chrome platinum line. |
 |
Sistema Hormiga
Crane system rails installation |
 |
Piasa
Man Power Supply |
 |
GETTC
8 equipment's installation and connection services. |
|
|
 |
Vernell
Fructose piping reconnection.
|
|
|
|
2009 |
 |
Armeton
Fabrication and installation for concrete vibrating tables. |
|
|
 |
La Sabroza
Piping installation for new equipment at kitchen area. |
|
|
 |
Bricmont
Oven ducts fabrication. |
|
|
|
2010 |
 |
Mars
Walls´protection installation. |
|
Johnson Controls
Supply, fabrication and installation of equipment structure for recycling plant. |
 |
Piasa
Mezzanine engineering |
 |
Cifunsa
Supply, fabrication and installation of tower for sand silos at Plant 2. |
|
|
|
2011 |
 |
Coilplus
CTL Metal Sheet Cutting Metal Line installation |
 |
Melter
Boldrini Press line relocation from Jesup GA, USA to Apocada NL México |
|
|
|
2012 |
|
|
|
2013 |
|
|
|
2015 |
|
Lego Real State
Design and Installation of flashings for doors and windows at P1 and Molding design for new training rooms.
|
|
|
|
Loi Thermoprocess GMBH
Electromechanical Installations of heat treatment furnaces in Posco Plant Celaya, Gto.
|
|
|
|
Stirling Power Inc.
Engineering and export services to send cryo cooler to Michigan, USA.
|
|
|
|
2016 |
|
Ulbrinox Inc.
Electromechanical Installations of 2 slitters for SS and 1 transport line.
|
|
|
|
Inifed
Participation in Federal School Rebuilding in CDMX.
|
|
|
|
British American Tobacco
Electromechanical dismantling of old primary tobacco process machinery for new machinery lay out.
|
|
|
|
Comas Macchine Speciali Spa.
Electromechanical installations of new primary tobacco process plant at BAT.
|
|
|
|
2017 |
|
Ulbrinox Inc.
Supply and installation of hydraulic elevator for slitter line with 2 ton cap.
|
|
|
|
British American Tobacco
PMD Project, Dismantling of equipment for transfer to Tepic Plant.
Ice Blast on building 7 roofs Hauni Tobacco dryer installation.
|
|
|
|
Comas Macchine Speciali Spa.
Phases 3 and 4 of the electromechanical installation of PMD new process line.
|
|
|
|
Welmont, SA de CV
Mechanical surveying of rotary dryer.
|
|
|
|
Inifed
Federal School Rebuilding in CDMX.
|
|
|
|
Instant Foods
Retrofit of HMC dry soup packing line.
|
|
|
|
Graftech
Remodeling of 60 year old industrial kitchen installation of stainless steel drainage solutions including new catch basins and trenches overhead crane rails survey and leveling.
|
|
|
|
2018 |
|
Comas Macchine Speciali Spa.
Phases 5 to 9 Conveyor system and Silo installation at PMD BAT Monterrey.
|
|
|
|
Graftech
Design and Engineering for illumination, ventilation systems.
Design and Manufacture of overhead crane cabin re lay out of scrap yard.
|
|
|
|
British American Tobacco
Unloading of equipment for installation PMD support and service piping installation.
|
|
|
|
Instant Foods
Installation of used HMC dry soup packaging line.
|
|
|
|
USG de México, SA de CV
Supply and installation of 250 ton Portland Cement Silo.
|
|
|
|
Loi Thermprocess GMBH
Electromechanical Installations of retrofitted heat treatment furnace at Garay plant in Celaya Guanajuato.
|
|
|
|