|
Piasa
Place of execution |
Apodaca, N.L. |
Work done |
-Mezzanine engineering
-Equipment temporary relocation
-Mezzanine installation including civil works for mezzanine foundation and concrete floor.
-Sump installation for washing drain, including grease trap and pumping systems.
-Final equipment arrangement engineering.
-Final equipment arrangement installation. |
Category |
Food industry. |
|
|
|
|
|
|