| 2003 |
 |
Phelps Dodge
General maintenance to enameling oven. |
|
| |
|
| 2004 |
 |
GEIMM
Installation of crane and steel cutter machine |
| |
|
 |
Phelps Dodge
Relocation of ovens and machinery for magnet wire process |
|
| |
|
| 2005 |
 |
Black & Decker
Paint ovens installation and equipment relocation. |
| |
|
 |
Tempel
Slitter equipment leveling and installation. |
| |
|
 |
Arnecom
Relocation of process equipment for cable production. |
| |
|
 |
Piasa
Stainless steel process tanks adjustment and installation.
|
| |
|
 |
GEIMM
Cut building expansion. |
| |
|
 |
Kwikset
Equipment installation |
|
| |
|
| 2006 |
 |
Comex
Gypsum board plant mechanical installation. |
| |
|
 |
Piasa
Steam generation system installation. |
 |
Alcoa
Dura Bright treatment tanks system installation |
 |
GETTC
Equipment relocations. |
| |
|
 |
Magnekon
Enameling cable oven installation. |
| |
|
 |
GEIMM
CASA project process equipment relocation from Cd. Juarez, Chihuahua, to García, N.L. |
|
| |
|
| 2007 |
 |
Magnekon
Enameling cable oven installation. |
| |
|
 |
Flinn & Dreffein
Oven installation at Tempel de Mexico plant. |
| |
|
 |
Man
USG Gypsum board plant mechanical and electrical installation |
 |
Prosel
Cooling tower and docks installation |
 |
Honeywell
Electric backup system installation. |
 |
Honeywell
Reconfiguration of equipment layout at Low Bay area. |
 |
USG
Mill maintenance and installation. |
 |
Lamosa
Services pipes supply and installation. |
 |
Docsa
Power and light systems supply and installation. |
 |
GETTC
Equipment relocation at plant. |
 |
Jones Lang Lasalle
General maintenance services for buildings. |
|
| |
|
| 2008 |
 |
Honeywell
300PSI Compressor and Header installation |
|
Palm Technologies
Electrical and control installation for platinum chrome line. |
 |
Weiser Lock
Installation for 2000Amp electric feed for chrome platinum line. |
 |
Sistema Hormiga
Crane system rails installation |
 |
Piasa
Man Power Supply |
 |
GETTC
8 equipment's installation and connection services. |
| |
|
 |
Vernell
Fructose piping reconnection.
|
|
| |
|
| 2009 |
 |
Armeton
Fabrication and installation for concrete vibrating tables. |
| |
|
 |
La Sabroza
Piping installation for new equipment at kitchen area. |
| |
|
 |
Bricmont
Oven ducts fabrication. |
|
| |
|
| 2010 |
 |
Mars
Walls´protection installation. |
|
Johnson Controls
Supply, fabrication and installation of equipment structure for recycling plant. |
 |
Piasa
Mezzanine engineering |
 |
Cifunsa
Supply, fabrication and installation of tower for sand silos at Plant 2. |
|
| |
|
| 2011 |
 |
Coilplus
CTL Metal Sheet Cutting Metal Line installation |
 |
Melter
Boldrini Press line relocation from Jesup GA, USA to Apocada NL México |
|
| |
|